Skip to main content
Translate
Default
English
Español
Français

User Access


RClub pinned ad
Tremco -  Ad - Spring Into Action With a Roof Inspection
Forum pinned ad
Information pinned ad
RLW pinned ad
NRCA -  - Roofing week
Translate
Default
English
Español
Français

More than a roofer...

« Back To Roofers Talk
Author
Posts
December 11, 2015 at 8:02 a.m.

RoofDude

Check this guy out....

https://youtu.be/P73REgj-3UE

December 11, 2015 at 3:51 p.m.

GKRFG1

I wonder how long it took to build that. Pretty interesting.

December 12, 2015 at 5:38 p.m.

wywoody

That is interesting. He needs to have the roof on before he can build and wattle the walls, even though the structure would be much more stable and able to handle the weight if the walls went up first.

But jungle rains would dissolve the walls. So all the tiles have to be made before you can start on the walls. The labor for that would take days.

There isn't enough overlap on the tiles for them to not have a sidelap system. You can see too much daylight through them.

December 12, 2015 at 5:50 p.m.

Lefty1

We can do anything if we set our minds to it. The creative side of us is amazing.

That roof will leak.

December 14, 2015 at 11:10 a.m.

Mike H

I'm impressed!


« Back To Roofers Talk
You must be logged in to reply to this topic.

Sheridan Tools - Banner Ad - May 2022
Translate
Default
English
Español
Français

User Access


RLW pinned ad
Directory pinned ad
Information pinned ad
Tremco -  Ad - Spring Into Action With a Roof Inspection
Metalforming -  Ad - April 2022
RClub pinned ad

Loading…
Loading the web debug toolbar…
Attempt #