Short cut on valleys

« Back To Roofers Talk
Author
Posts
October 7, 2009 at 2:49 p.m.

tico

gutter straps

October 8, 2009 at 1:03 p.m.

Terry D

not only gutter straps, the gutter itself is a bit on the loopy side. Also, it looks like the chimney was not flashed.

October 8, 2009 at 4:44 p.m.

Old School

Come on Terry, they were the low bidder and they didn't actually figure any of those things. they did use shingles; what more can you ask for.

October 8, 2009 at 6:54 p.m.

OLE Willie

We have had a ton of rain this year and i've ran into a lot of leaks at the bottom of valleys where a wall connects with like a one foot piece of facia and usually theres a gutter attatched. The roofers do not install any flashing at this 1 ft. wall just below the valley. Neither do they let the valley metal hang over far enough to prevent a leak. For that matter they dont even caulk it. They just cut the shingles up against where the facia/gutter meet the roof deck. Today i sold a repair on one that was particularly interesting as for some reason ( probably in an effort to get the valley metal to lay down smoother over the facia and gutter ) they made a cut in the valley metal at the bottom. Cutting it around the facia. This made it 100 more times likely to leak. If your able to get the shingles far back underneath the facia then you wouldnt have to have any flashing etc. But the problem is that the carpenters run the facia too far right into the roof deck so you cant in most cases. We used to have one guy take a long crow bar, pry up the facia ( and the whole upper side for that matter ) lol while another guy roofed it in, sliding the shingles far back up under the facia. Seems either no one knows these tricks these days or more likely no one gives a crap!

October 8, 2009 at 7:01 p.m.

Old School

The later!

October 8, 2009 at 7:02 p.m.

CIAK

What I'm seeing here other than the obvious is impatience. Not looking at the end result of what is started . I'm a master at finding leaks. can find a leak where others have tried and failed many times over . Patience is the key and a keen eye .

October 14, 2009 at 9:08 p.m.

soldierboy

OLE Willie Said: We have had a ton of rain this year and ive ran into a lot of leaks at the bottom of valleys where a wall connects with like a one foot piece of facia and usually theres a gutter attatched. The roofers do not install any flashing at this 1 ft. wall just below the valley. Neither do they let the valley metal hang over far enough to prevent a leak. For that matter they dont even caulk it. They just cut the shingles up against where the facia/gutter meet the roof deck. Today i sold a repair on one that was particularly interesting as for some reason ( probably in an effort to get the valley metal to lay down smoother over the facia and gutter ) they made a cut in the valley metal at the bottom. Cutting it around the facia. This made it 100 more times likely to leak. If your able to get the shingles far back underneath the facia then you wouldnt have to have any flashing etc. But the problem is that the carpenters run the facia too far right into the roof deck so you cant in most cases. We used to have one guy take a long crow bar, pry up the facia ( and the whole upper side for that matter ) lol while another guy roofed it in, sliding the shingles far back up under the facia. Seems either no one knows these tricks these days or more likely no one gives a crap!

We have taken our sawzalls and cut downt the fascia board allowing us to put the shingles deep inside the wall area, when we can't do that we put step flashing tins behind the fascia board. We also run our valley's past the fascia far enough to not allow water to wick it's way back in. We have been using the trick method for some time. We install ice and water shield 3' centered, then a metal valley with a one inch center (W), then we have 6" strips of ice guard to sandwich the metal in. We then install a shingle up the valley area (No need to cut the shingles) and only nail into the ice and water shield. We have been running this way ever since ELK (NOW GAF/ELK) have allowed it. Heck, CertainTeed allows this for there 20-year workmanship warranty now. Haven't had a problem with this method yet.

Closed cut, and weaved valley's we had problems with in one way or another. Don't use that method anymore.

October 14, 2009 at 9:57 p.m.

clublaugh

OLE Willie Said: We have had a ton of rain this year and ive ran into a lot of leaks at the bottom of valleys where a wall connects with like a one foot piece of facia and usually theres a gutter attatched. The roofers do not install any flashing at this 1 ft. wall just below the valley. Neither do they let the valley metal hang over far enough to prevent a leak. For that matter they dont even caulk it. They just cut the shingles up against where the facia/gutter meet the roof deck. Today i sold a repair on one that was particularly interesting as for some reason ( probably in an effort to get the valley metal to lay down smoother over the facia and gutter ) they made a cut in the valley metal at the bottom. Cutting it around the facia. This made it 100 more times likely to leak. If your able to get the shingles far back underneath the facia then you wouldnt have to have any flashing etc. But the problem is that the carpenters run the facia too far right into the roof deck so you cant in most cases. We used to have one guy take a long crow bar, pry up the facia ( and the whole upper side for that matter ) lol while another guy roofed it in, sliding the shingles far back up under the facia. Seems either no one knows these tricks these days or more likely no one gives a crap!

I know what you mean! We've repaired some million dollar houses where the bottoms of the valleys leaked because of that. We always run a shingle under the fascia, flashing and another shingle or two against the fascia, then the valley.

October 15, 2009 at 6:25 p.m.

OLE Willie

Yeah Soldierboy I guess theres nothing wrong with that type of valley. Im just old school and its new to me. I've never personally used that method but i run into it more and more often while im on repair calls and looking all around the roof. I dont recall being called out to repair that style yet. The closed cut method works great as long as you let the middle tab or middle part of a shingle land in the center of the valley. Too many inexpeirienced roofers out there just letting the shingles fall wherever they will causing leaks. But i guess i should be pleased about that. $$$$$$$$$$$$$$$$$ lol


« Back To Roofers Talk
You must be logged in to reply to this topic.

Sheridan Tools - Banner Ad - May 2022
Translate
Default
English
Español
Français

User Access


RClub pinned ad
Leap -  Ad - Empowering Contractors
Metalforming -  Ad - April 2022
Forum pinned ad
Directory pinned ad
asdf12

Loading…
Loading the web debug toolbar…
Attempt #